Iraq Pedestrian Bridge Project on the Path of Hussainiya Proudly delivered by Owj Lift Company in 2023.
The elevators and escalators installed at the pedestrian bridge in Iraq include:
The technical features of the equipment are as follows:
Motor | Ziehl-Abegg Germany | High-performance and durable motors |
Control Panel | Gefran Italy | Advanced control panels for precise movement management |
Doors | Selcom Turkey | Doors meeting global safety and quality standards |
The elevators and escalators at the pedestrian bridge on the Path of Hussainiya were designed and built to ensure comfort for pilgrims and pedestrians. Considering the high foot traffic and the environmental conditions of the area, all equipment installed in this project adheres to international standards.
With over 20 years of experience, Owj Lift Company is a leader in the elevator and escalator industry, offering consultation, design, supply, installation, and after-sales services. Supported by skilled managers and experienced technicians, the company ensures successful execution of complex projects both domestically and internationally. At Owj Lift, we not only excel in providing and implementing sophisticated projects but also offer 24/7 maintenance services and a 3-year warranty to guarantee top-notch quality.
For more details on our successful projects and expert consultation in elevators and escalators, contact our specialists today.
In which year was the Iraq Pedestrian Bridge project on the Path of Hussainiya delivered by Owj Lift?
Iraq Pedestrian Bridge Project on the Path of Hussainiya Proudly delivered by Owj Lift Company in 2023.
What installations were completed for the Iraq Pedestrian Bridge project?
4 outdoor escalators and 2 panoramic elevators (semi-European MRL)
Which brand supplies the motors for the elevators in this project?
Ziehl-Abegg Germany High-performance and durable motors
What standards were followed for the installations on the Path of Hussainiya?
Considering the high foot traffic and the environmental conditions of the area, all equipment installed in this project adheres to international standards.